Description:
This was an interesting waterproofing operation designed and installed by the contracting staff at the BriggsAmasco branch in Glasgow,which solved a ten-year old ingress problem to the roof terrace entrance to the Anderson Building over the lecture theatres below. After extensive exploration, new falls were established, waterproofing was by a hot melt system followed by insulation, topped by a wearing service of decorative paving slabs.
Location:
Glasgow
Approx. Area:
700m2
Specification:
Hot Melt and Insulation