Briggs are contracted by Laing O’rourke to deliver the all the flat roofing at Everton’s new stadium at Bramley Moore Dock Liverpool.

This extends to

  • 5,000m2 of IKO Permaphalt and Permapark Mastic Asphalt covering the main plant areas above the crucial hospitality and trading areas of the stadium.
  • 600m2 Sika Sarnafil Warm roofs to the east and west canopies including metal decking.
  • Aperture SP sealing system to the many roof penetrations.
  • 400m2 Bauder green roof to teh Hydraulic Tower which will become a visitor centre for the development.
  • Site logistics and safety associated with the entire flat roofing package.
  • Value in excess of £3.5m

You can view the video by clicking here.