The Best of British supplement from RCI Magazine has covered the work BriggsAmasco has completed at Battersea Power Station, in London.
The Grade II-listed chimneys were rebuilt with IKO Permaphalt used for the base. In addition 8,000m2 IKO Permatec waterproofing membrane together with inverted insulation and sedum green roofs were installed across the project.
Read the full article of the RCI website (page 11).