Description:
BriggsAmasco is one of the very few companies with the capacity to provide up to twenty directly employed skilled asphalters for a project of this size. Re-surfacing the southbound main span of this famous suspension bridge, working only at weekends, the asphalt was laid in bays by hand to a thickness of 38mm, the material being delivered directly to site in thermostatically controlled hot charge vehicles by Permanite.
Location:
Scotland
Approx. Area:
13500m2
Specification:
Mastic Asphalt